Project P-31 · Abu Dhabi, UAE
BMS Commissioning — Office Building (Level 6)
Installation, Offline Programming, Testing, and Commissioning of PLC in Level 6 – 2 Nos. Scheduling all the devices as per the current sequence of operation. Two HMI unit calibration.

Scope of work
What Segmicdelivered
Installation, Offline Programming, Testing, and Commissioning of PLC in Level 6 – 2 Nos. Scheduling all the devices as per the current sequence of operation. Two HMI unit calibration.